Warfeather fabricated and installed 7 Gateway Arches and towers for the downtown revitalization effort for the City of Muskogee, OK. The project included construction of foundations, road boring, new utility service, custom steel fabrication/installation, painting and waterproofing. There were two Gateway arches installed over existing highways that required coordination with City, County, and State entities and the temporary closure of the main heavy haul route through the City of Muskogee Warfeather worked closely with the design team to assess structural components for long-term public safety and to minimize business operations during construction Installation of arches required detailed lift plans involving (2) 200 TON cranes, multiple pieces of equipment, and coordination of engineering/safety inspections. The project was completed on time, with no cost increases, and no punch-list deficiencies.
Location:
Muskogee, OK
Size/Type:
New Construction
Cost:
$750,000